ProjectCategoryLocationDollar Value (US)
2×660MW Coal-fired Power Plants at Port Qasim KarachiCoal Mining / Power PlantPort Qasim, Sindh$1.9B
300MW Imported Coal Based Power Project at Gwadar, PakistanCoal Mining / Power PlantGwadar, Balochistan$540M
Allama Iqbal Industrial City, FaisalabadEconomic ZoneFaisalabad, PunjabUnknown
Construction of Breakwaters and Gwadar Smart Port City Master PlanPortGwadar, Balochistan$120M
Development of Free ZoneEconomic ZoneGwadar, Balochistan$32M
Engro 2x330MW Thar Coal Power ProjectCoal Mining / Power PlantThar-Block-II, Sindh$1.0B
Gwadar East-Bay ExpresswayHighwayGwadar, Balochistan$170M
Gwadar Fresh Water Treatment FacilityFresh Water Treatment FacilityGwadar$130M
Gwadar – Turbat – Hoshab (M-8)HighwayGwadar to Turbat to Hoshab, Balochistan$180M
Hakla D.I Khan MotorwayHighwayHakla to Dera Ghazi Khan, Punjab$1.7B
Havelian Dry port (450 M. Twenty-Foot Equivalent Units)PortHavellian, KPK$65M
HUBCO Coal Power Project, Hub BalochistanCoal Mining / Power PlantHub, Balochistan$1.9B
HUBCO Thar Coal Power Project (Thar Energy)Coal Mining / Power PlantThar-Block-II, Sindh$500M
Hydro China Dawood Wind Farm(Gharo, Thatta)WindBhanbore, Sindh$110M
Karachi-Peshawar (ML-1) railroadRailwayKarachi to Peshawar$6.8M
Karot Hydropower StationHydropowerRiver Jhelum, dual boundary of Rawalpindi, Punjab and Kotli, AJK$1.7B
Khuzdar-Basima Road N-30 (110 km)HighwayBasima to Khudzar, Baluchistan$260M
KKH Phase II (Thakot -Havelian Section)HighwayThakot to Havelan, KPK$1.3B
Kohala Hydropower ProjectHydropowerKohala$2.4B
Matiari to Lahore ±660kV HVDC Transmission Line ProjectPower Transmission LineMatiari, Sindh to Lahore, Punjab$1.7B
New Gwadar International AirportAirportGwadar, Balochistan$230M
Orange Line - LahoreUrban Public TransportLahore, Punjab$1.6B
Pak China Friendship HospitalHospitalGwadar, Balochistan$100M
Pak-China Technical and Vocational Institute at GwadarVocational and Technical Training InstituteGwadar, Balochistan$10M
Pakistan-China Optical Fiber Cable ProjectFiber Optics CableRawalpindi, Punjab to Khunjerab, Gilgit-Baltisan$44M
Peshawar-Karachi Motorway (Multan-Sukkur Section)HighwayKarachi to Peshawar, Sindh$2.9B
Quaid-e-Azam 1000MW Solar Park (Bahawalpur) Quaid-e-AzamSolarBahawalpur, Pubjab$780M
Rashakai Economic Zone , M-1, NowsheraEconomic ZoneRashakai, KPKUnknown
Sachal Wind Farm (Jhimpir, Thatta)WindJhimpir, District Thatta$130M
Sahiwal 2x660MW Coal-fired Power Plant, PunjabCoal Mining / Power PlantSahiwal, Punjab$1.9B
SSRL Thar Coal Block-I 6.8 mtpa & Power Plant(2×660MW) (Shanghai Electric)Coal Mining / Power PlantThar-Block-I, Sindh$1.9B
Suki Kinari Hydropower Station, Naran,Khyber PukhtunkhwaHydropowerRiver Kunhar, KPK$1.7B
Surab-Hoshab (N-85)HighwaySurab to Hoshab, Balochistan$240M
Surface mine in block II of Thar Coal field, 3.8 million tons/yearCoal Mining / Power PlantThar-Block-II, Sindh$630M
ThalNova Thar Coal Power ProjectCoal Mining / Power PlantThar-Block-II, Sindh$500M
Three Gorges Second and Third Wind Power ProjectWindJhimpir, Sindh$150M
UEP Wind Farm (Jhimpir, Thatta)WindJhimpir, Sindh$250M
Upgradation of D.I.Khan (Yarik) - Zhob, N-50 Phase-I (210 km)HighwayYarik, KPK to Zhob, Balochistan$1.0B
Zhob Quetta (N-50)MotorwayZhob to Quetta, Balochistan$910M